Paver calculator
Work out how many pavers you need, plus the bedding sand and road base underneath.
- Bedding sand–
- Road base (compacted)–
How many pavers per square metre?
Divide 1 m² by the area of one paver, including half the joint on each side. For a 400 × 400 mm paver with 3 mm joints, that's 1 ÷ (0.403 × 0.403) ≈ 6.2 pavers per m². Then multiply by your area and add extra for cuts.
| Paver size | Pavers per m² (3 mm joints) |
|---|---|
| 230 × 115 mm | about 36.4 |
| 200 × 100 mm | about 47.8 |
| 300 × 300 mm | about 10.9 |
| 400 × 400 mm | about 6.2 |
| 600 × 300 mm | about 5.5 |
| 600 × 600 mm | about 2.8 |
How much extra to allow
Allow 5% for a plain rectangle with few cuts, 10% for most jobs, and 15% for curves, herringbone patterns or lots of edges. Keep a few spares from the same batch for future repairs, because colours shift between production runs.
Sand and base
Most paved areas sit on a compacted road base with a screeded layer of bedding sand on top. A 20 to 30 mm sand bed is common. Road base depth depends on the load: around 75 to 100 mm under paths and patios, and more under driveways. Follow the paver manufacturer's guide for your site.
Results are estimates. Check pack sizes and coverage with your supplier before you order.