How Much Concrete for a 6 × 3 Slab? (m³ and Bags)
22 November 2026
A 6 m × 3 m slab poured 100 mm thick needs 1.8 m³ of concrete. Add 10% for waste and order about 2 m³. If you're mixing bags, that's roughly 195 bags of 20 kg premix before waste, so for a slab this size you'll almost always want a truck.
The working
Concrete volume is length × width × depth, all in metres. The depth is usually given in millimetres, so divide it by 1,000 first.
6 × 3 × 0.1 = 1.8 m³
Then add a margin. The ground is never perfectly flat, formwork bows a little, and some concrete stays in the barrow and the chute. 5% is enough on a well-prepared, level base. 10% is a safer default. Go to 15% if the base is rough or you're digging footings by hand.
1.8 × 1.1 = 1.98 m³, so order 2.0 m³.
6 × 3 slab at other depths
| Depth | Concrete | With 10% extra | 20 kg bags (with extra) |
|---|---|---|---|
| 75 mm | 1.35 m³ | 1.49 m³ | about 161 |
| 100 mm | 1.80 m³ | 1.98 m³ | about 214 |
| 125 mm | 2.25 m³ | 2.48 m³ | about 268 |
| 150 mm | 2.70 m³ | 2.97 m³ | about 321 |
Bag counts use about 108 bags of 20 kg premix per cubic metre. The yield varies a little between brands, so check the bag.
Don't forget the edges
Many slabs have a thickened edge beam or internal beams, especially house slabs, garage slabs and anything an engineer has drawn. Those beams can add a lot of volume. Work them out separately as long, narrow "slabs" (length × width × the extra depth) and add them to the total. If you have drawings, use the dimensions on them.
Bags or a truck?
At around 2 m³, ready-mix wins easily. Mixing 200-odd bags by hand or in a small mixer takes most of a day, and the first batch will be going off before the last one goes in, which leaves cold joints in the slab.
- Under 0.5 m³: bags are fine. Post holes, small pads, steps.
- 0.5 to 1.5 m³: price both. A small truck load often costs about the same once you count your time.
- Over 1.5 m³: order ready-mix.
When you ring the plant, ask about their minimum load and short-load fee, how they round orders (often in steps of 0.2 m³), and how long the truck can wait before they charge waiting time. Have your barrows, crew and screed ready before it turns up.
Check the depth before you order
The figure that throws estimates out most is depth. If the base is 20 mm low across the slab, a 100 mm slab is really 120 mm, and you need 20% more concrete. Run a string line and measure the depth from it in several places, then use the average. It's much cheaper than a second truck.
This is a general estimate, not engineering advice. Follow your engineer's drawings, your council's requirements and the Australian Standards for structural slabs.
Skip the maths. Put your own measurements in and get the answer in seconds, on your phone.
Open the concrete calculator